Westar Energy (Evergy)
Worst-Performing Circuit, Field-Walk and Design
Date of Award: April 2018
Contract Status: Complete
- Serviced from Corporate Offices located in Kansas City, MO
- Distribution Engineering / Design Services
- Completed field walkdown and inspections on 10 worst-performing circuits
- Full inventory of structures, Sound and Bore performed
- Design Packages created in Maximo for construction crews to remedy the circuits
- Distribution OH improvement/maintenance
- Deteriorated Pole Replacement’s trouble circuits
POWER THE FUTURE WITH US
LET’S START WITH A CONVERSATION.
Whether you’re interested in our services, a partnership, or a career at QUES. Start the conversation with an email or phone call.