Home Projects

Union Pacific Railroad

See All Projects

Arc Flash Hazard Analysis

Date of Award: December 2014

Contract Status: Completed

  • Serviced from Regional Office located in Sumner, WA
  • Arc Flash Hazard Analysis
    • Field-data Collection
      • Short-Circuit Study
      • Protective Device Coordination Study
    • Provided Warning Labels for All Energized Electrical System Equipment:
      • Arc flash boundaries
      • Shock hazard boundaries
      • Personal Protective Equipment (PPE)
    • Final report included the following elements:
      • All the modes of operations
      • One-line diagrams
      • TCC curves
      • All study reports:
        • Short Circuit Analysis
        • Equipment Evaluation
        • Protective Device Coordination
        • Arc Flash Hazard Analysis for worst-case scenario
QUES Copyright © 2024
Back to Top