Union Pacific Railroad

Union Pacific Railroad

Arc Flash Hazard Analysis

Date of Award: December 2014

Contract Status: Completed

  • Serviced from Regional Office located in Sumner, WA
  • Arc Flash Hazard Analysis
  • Field-data Collection
  • Short-Circuit Study
  • Protective Device Coordination Study
  • Provided Warning Labels for All Energized Electrical System Equipment:
  • Arc flash boundaries
  • Shock hazard boundaries
  • Personal Protective Equipment (PPE)
  • Final report included the following elements:
  • All the modes of operations
  • One-line diagrams
  • TCC curves
  • All study reports:
  • Short Circuit Analysis
  • Equipment Evaluation
  • Protective Device Coordination
  • Arc Flash Hazard Analysis for worst-case scenario

POWER THE FUTURE WITH US

Whether you’re interested in our services, a partnership, or a career at QUES. Start the conversation with an email or phone call.

Name
This field is for validation purposes and should be left unchanged.