Engineer, Procure, & Construct (EPC)

Date of Award: May 2018

Contract Status: Completed

  • Serviced from Corporate Offices located in Kansas City, MO
  • Storm Hardening Replacement of 515 miles of single-phase, rural distribution across MEC service territory
    • Approximately 16,000-Pole Installation
    • Fast-Track Project
    • 200 Discrete Line Sections
  • Integrated Engineering Model
    • LiDAR Data Collection (Electronic Upload to Design)
    • PLS-CADD Design (Outside MEC System)
      • Create MEC Standards Template & Material BOMs
      • Plan & Profile Drawings
      • Pole-Load Analysis
      • Custom As-Built Process
      • Electronic Update of MEC Systems
  • Material Procurement – Utilizing MEC Blanket Pricing
    • Separate Material Receipt, Storage, & Expediting
    • MEC Standards BOMs
    • Reconciliation by Map
  • Construction (Sister Company PAR Electrical Contractors, Inc.)
    • Construction Safety Plan
    • Distribution Operations Center Coordination
    • Locates
  • PMO
    • Project Controls – P6 Schedule; Project Reporting
    • QA/QC Plan – Audit, Punch-list & MEC Acceptance
    • Permitting
    • Electric Customer Outreach, Concerns, & Design Considerations